Recent improvements and present status of the Munich accelerator facility

The terminal voltage of the MP-tandem in routine operation has been raised to 15 MV. A new negative ion injector with mass resolutions up to 1:180 has been installed. Commissioning of the superconducting booster TRITRON is in progress, the beam has been injected and gone along 2.6 turns. The TRITRON...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Nuclear instruments & methods in physics research. Section A, Accelerators, spectrometers, detectors and associated equipment Accelerators, spectrometers, detectors and associated equipment, 1996-11, Vol.382 (1), p.78-81
Hauptverfasser: Münzer, H, Rohrer, L, Carli, W, Hartung, P, Schnitter, H, Trinks, U
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The terminal voltage of the MP-tandem in routine operation has been raised to 15 MV. A new negative ion injector with mass resolutions up to 1:180 has been installed. Commissioning of the superconducting booster TRITRON is in progress, the beam has been injected and gone along 2.6 turns. The TRITRON and most subsystems of the tandem are now under computer control.
ISSN:0168-9002
1872-9576
DOI:10.1016/S0168-9002(96)00388-9