Optimal Policies for a K-Phase Service System with Bernoulli Vacation Schedule
This paper studies Optimal NT policies for a k-phase service M/G/1 system with Bernoulli vacation schedule. The system contains an unreliable server with a breakdown period and delaying period. The server determines to start service by the policy: the server reactivates as soon as the number of arri...
Gespeichert in:
Veröffentlicht in: | Applied Mechanics and Materials 2014-06, Vol.590 (Innovative Solutions in the Field of Engineering Sciences), p.768-772 |
---|---|
Hauptverfasser: | , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | This paper studies Optimal NT policies for a k-phase service M/G/1 system with Bernoulli vacation schedule. The system contains an unreliable server with a breakdown period and delaying period. The server determines to start service by the policy: the server reactivates as soon as the number of arrivals in the queue reaches to a predetermined threshold N or T time units have elapsed since the end of the completion period. There are k phases of service in the system. After the completion of k phases service, the server may take a short vacation or may remain in the system to serve the next unit, which is defined by Bernoulli vacation schedule. Moreover, we assume the server fails according to a Poisson process whose repair time follows a general distribution. In final, we analyze the system characteristics for each scheme and obtained the optimal NT threshold to minimize the cost function. |
---|---|
ISSN: | 1660-9336 1662-7482 1662-7482 |
DOI: | 10.4028/www.scientific.net/AMM.590.768 |