Assembly study for JT-60SA tokamak
The assembly scenarios and assembly tools of the major tokamak components for JT-60SA are studied in the following. (1) The assembly frame (with a dedicated 30-tonne crane), which is located around the JT-60SA tokamak, is adopted for effective assembly works in the torus hall and the temporary suppo...
Gespeichert in:
Veröffentlicht in: | Fusion engineering and design 2013-10, Vol.88 (6-8), p.705-710 |
---|---|
Hauptverfasser: | , , , , , , , , , , , , , , , , , , , , , , , , , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The assembly scenarios and assembly tools of the major tokamak components for JT-60SA are studied in the following. (1) The assembly frame (with a dedicated 30-tonne crane), which is located around the JT-60SA tokamak, is adopted for effective assembly works in the torus hall and the temporary support of the components during assembly. (2) Metrology for precise positioning of the components is also studied by defining the metrology points on the components. (3) The sector segmentation for weld joints and positioning of the vacuum vessel (VV), the assembly scenario and tools for VV thermal shield (TS), the connection of the outer intercoil structure (OIS) and the installation of the final toroidal field coil (TFC) are studied, as typical examples of the assembly scenarios and tools for JT-60SA. |
---|---|
ISSN: | 0920-3796 1873-7196 |
DOI: | 10.1016/j.fusengdes.2012.12.011 |