Research on the Assembly Line Scheduling of Fixed Objects for the Large Complex Products

According to the complexity of the assembly line for the large complex products, a new production pattern with fixed objects for the mixed model assembly line is proposed. Improved GA is used to solve the scheduling problem .In this paper, a production scheduling system is developed. It can speed up...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Applied Mechanics and Materials 2013-12, Vol.483 (Mechanical Engineering, Materials and Energy III), p.538-541
Hauptverfasser: Lin, Yi Li, Lu, Jian Feng
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:According to the complexity of the assembly line for the large complex products, a new production pattern with fixed objects for the mixed model assembly line is proposed. Improved GA is used to solve the scheduling problem .In this paper, a production scheduling system is developed. It can speed up the production cycle, lower the cost, improve the productivity and so on.
ISSN:1660-9336
1662-7482
1662-7482
DOI:10.4028/www.scientific.net/AMM.483.538