Research on the Assembly Line Scheduling of Fixed Objects for the Large Complex Products
According to the complexity of the assembly line for the large complex products, a new production pattern with fixed objects for the mixed model assembly line is proposed. Improved GA is used to solve the scheduling problem .In this paper, a production scheduling system is developed. It can speed up...
Gespeichert in:
Veröffentlicht in: | Applied Mechanics and Materials 2013-12, Vol.483 (Mechanical Engineering, Materials and Energy III), p.538-541 |
---|---|
Hauptverfasser: | , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | According to the complexity of the assembly line for the large complex products, a new production pattern with fixed objects for the mixed model assembly line is proposed. Improved GA is used to solve the scheduling problem .In this paper, a production scheduling system is developed. It can speed up the production cycle, lower the cost, improve the productivity and so on. |
---|---|
ISSN: | 1660-9336 1662-7482 1662-7482 |
DOI: | 10.4028/www.scientific.net/AMM.483.538 |