Automatic Maintenance and Temperature Measurement System Prestressed Concrete Box Girder in the Use of Crack Control

In the Xiamen-Shenzhen Railway 32 m-span prestressed concrete box girder construction process, concrete box girder cracks always confused engineering and technical personnel, is a common and more difficult to solve quality problems, for box girder concrete surface cracks issues were discussed, and p...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Applied Mechanics and Materials 2013-10, Vol.443 (Computer-Aided Design, Manufacturing, Modeling and Simulation III), p.303-307
1. Verfasser: Zhao, Li Cai
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:In the Xiamen-Shenzhen Railway 32 m-span prestressed concrete box girder construction process, concrete box girder cracks always confused engineering and technical personnel, is a common and more difficult to solve quality problems, for box girder concrete surface cracks issues were discussed, and put forward a repair program to be applied in construction practice.
ISSN:1660-9336
1662-7482
1662-7482
DOI:10.4028/www.scientific.net/AMM.443.303