Experience of Implementing a PGU-200 MW Two-Boiler One-Turbine Unit at the South-West CHP

The engineering solutions for PGU-200 MW unit, the electrical distribution system layout, and the results of implementing the SPPA-T3000 control system are presented. The results of performance adjustment confirm that the requirements by the System Operator of the Unified Power System are met. The o...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Power technology and engineering 2014-07, Vol.48 (2), p.140-146
Hauptverfasser: Chugin, A. V., Tsvetkov, M. S., Kostyuk, R. I., Babkin, K. V., Bilenko, V. A., Molchanov, K. A., Fedunov, V. V., Razogreev, V. G.
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The engineering solutions for PGU-200 MW unit, the electrical distribution system layout, and the results of implementing the SPPA-T3000 control system are presented. The results of performance adjustment confirm that the requirements by the System Operator of the Unified Power System are met. The organizational structure for operating personnel is described.
ISSN:1570-145X
1570-1468
DOI:10.1007/s10749-014-0498-6