Robustness of water resources systems
When water resource systems investments are made there is little assurance that the predicted performance will coincide with the actual performance. Robustness is proposed as a measure of the likelihood that the actual cost of a proposed project will not exceed some fraction of the minimum possible...
Gespeichert in:
Veröffentlicht in: | Water resources research 1982-02, Vol.18 (1), p.21-26 |
---|---|
Hauptverfasser: | , , |
Format: | Artikel |
Sprache: | eng |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | When water resource systems investments are made there is little assurance that the predicted performance will coincide with the actual performance. Robustness is proposed as a measure of the likelihood that the actual cost of a proposed project will not exceed some fraction of the minimum possible cost of a system designed for the actual conditions that occur in the future. The robustness criterion is illustrated by its application to the planning of water supply systems in southwestern Sweden. |
---|---|
ISSN: | 0043-1397 1944-7973 |
DOI: | 10.1029/WR018i001p00021 |