Minimizing resource consumption on uniform parallel machines with a bound on makespan

With the crucial issue of environmental protection, managing natural resources efficiently and/or reducing the amount of carbon emissions have become more important than ever. In this paper, we introduce a uniform parallel machine scheduling problem where the objective is to minimize resource consum...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Computers & operations research 2013-12, Vol.40 (12), p.2970-2974
Hauptverfasser: Ji, Min, Wang, Jen-Ya, Lee, Wen-Chiung
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:With the crucial issue of environmental protection, managing natural resources efficiently and/or reducing the amount of carbon emissions have become more important than ever. In this paper, we introduce a uniform parallel machine scheduling problem where the objective is to minimize resource consumption given that the maximum completion time does not exceed a certain level. We show that the problem is strongly NP-hard. A tight lower bound and a particle swarm optimization algorithm are then developed. Finally, some computational results are provided.
ISSN:0305-0548
1873-765X
0305-0548
DOI:10.1016/j.cor.2013.06.011