Minimizing resource consumption on uniform parallel machines with a bound on makespan
With the crucial issue of environmental protection, managing natural resources efficiently and/or reducing the amount of carbon emissions have become more important than ever. In this paper, we introduce a uniform parallel machine scheduling problem where the objective is to minimize resource consum...
Gespeichert in:
Veröffentlicht in: | Computers & operations research 2013-12, Vol.40 (12), p.2970-2974 |
---|---|
Hauptverfasser: | , , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | With the crucial issue of environmental protection, managing natural resources efficiently and/or reducing the amount of carbon emissions have become more important than ever. In this paper, we introduce a uniform parallel machine scheduling problem where the objective is to minimize resource consumption given that the maximum completion time does not exceed a certain level. We show that the problem is strongly NP-hard. A tight lower bound and a particle swarm optimization algorithm are then developed. Finally, some computational results are provided. |
---|---|
ISSN: | 0305-0548 1873-765X 0305-0548 |
DOI: | 10.1016/j.cor.2013.06.011 |