Online scheduling with preemption or non-completion penalties
We consider online preemptive scheduling problems where jobs have deadlines and the objective is to maximize the total weight of jobs completed before their deadlines. In the first problem, preemptions are not free but incur a penalty. In the second problem, a job has to be accepted or rejected imme...
Gespeichert in:
Veröffentlicht in: | Journal of scheduling 2014-04, Vol.17 (2), p.173-183 |
---|---|
1. Verfasser: | |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | We consider online preemptive scheduling problems where jobs have deadlines and the objective is to maximize the total weight of jobs completed before their deadlines. In the first problem, preemptions are not free but incur a penalty. In the second problem, a job has to be accepted or rejected immediately upon arrival, and may need to be immediately allocated a fixed scheduling interval as well; if these accepted jobs are not eventually completed, the job is lost, and a penalty is incurred. We give an algorithm with the optimal competitive ratio for the first problem, and new and improved algorithms for the second problem, under different models of preemptions and job weights. |
---|---|
ISSN: | 1094-6136 1099-1425 |
DOI: | 10.1007/s10951-013-0321-5 |