Change point analysis of imprecise time series
In this paper we describe how to conduct a change-point analysis when dealing with time series imprecisely or vaguely observed, i.e. time ordered observations whose values are not known exactly, such as interval or ordinal time series (imprecise time series). In order to treat such time series, we p...
Gespeichert in:
Veröffentlicht in: | Fuzzy sets and systems 2013-08, Vol.225, p.23-38 |
---|---|
Hauptverfasser: | , , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | In this paper we describe how to conduct a change-point analysis when dealing with time series imprecisely or vaguely observed, i.e. time ordered observations whose values are not known exactly, such as interval or ordinal time series (imprecise time series). In order to treat such time series, we propose to employ a fuzzy approach i.e. data are parameterized in the form of fuzzy variables. Then, to detect the number and location of change points we employ a deviation measure for fuzzy variables in the framework of Atheoretical Regression Trees (ART). We present simulation results pertaining to the behavior of the proposed approach as well as two empirical applications to real imprecise time series. |
---|---|
ISSN: | 0165-0114 1872-6801 |
DOI: | 10.1016/j.fss.2013.03.001 |