Lead pollution from the external redecoration of old buildings

Lead concentrations before, during and after external redecoration have been measured in seven school playgrounds. All playgrounds showed increases in lead concentration during redecoration but the extent of contamination and duration varied enormously. The geometric mean lead value per school playg...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:The Science of the total environment 1986-12, Vol.57, p.181-190
Hauptverfasser: Rundle, S.A., Duggan, M.J.
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:Lead concentrations before, during and after external redecoration have been measured in seven school playgrounds. All playgrounds showed increases in lead concentration during redecoration but the extent of contamination and duration varied enormously. The geometric mean lead value per school playground, taken on the day of the highest concentration during redecoration, ranged from 370 to 5300 μg g −1. The two post-war schools had significantly lower lead in dust concentrations than the other older schools.
ISSN:0048-9697
1879-1026
DOI:10.1016/0048-9697(86)90022-7