Modelisation of the maintenance-production couple by a graph of scheduling
The problem of scheduling, both maintenance and production, was a work of many articles. The algorithms of genetics, ant, and multi-agent give solutions approaches with this problem. This paper modeled the problem in a simple and concrete way, pushing the researchers to propose a graph connecting th...
Gespeichert in:
Veröffentlicht in: | International journal on computer science and engineering 2013-08, Vol.5 (8), p.711-711 |
---|---|
Hauptverfasser: | , , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The problem of scheduling, both maintenance and production, was a work of many articles. The algorithms of genetics, ant, and multi-agent give solutions approaches with this problem. This paper modeled the problem in a simple and concrete way, pushing the researchers to propose a graph connecting the maintenance and the production with weighting realities. To develop the quality and validity of the model, a statistical tool is used for the calculation of the factors of variances, in order to improve the output of the production. |
---|---|
ISSN: | 0975-3397 |