Consistency Is Key to Warm Mix Installation at Boston Logan Airport
"We know quite a bit about production of warm mix in general and the P-401 mix in particular," says [Kevin Riley]. "And we've learned the workmanship it takes to get acceptable mat and longitudinal joint density. The trick is managing the laydown and compaction processes so certa...
Gespeichert in:
Veröffentlicht in: | The Asphalt contractor 2013-02, Vol.27 (2), p.18 |
---|---|
1. Verfasser: | |
Format: | Magazinearticle |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | "We know quite a bit about production of warm mix in general and the P-401 mix in particular," says [Kevin Riley]. "And we've learned the workmanship it takes to get acceptable mat and longitudinal joint density. The trick is managing the laydown and compaction processes so certain key elements - paving speed, mat thickness, rolling patterns and mat temperature - have no significant variation." |
---|---|
ISSN: | 1055-9205 |