Statoil leads overhaul of Norwegian development drilling, intervention fleet

From the market we weren't getting the fit-for-purpose solution that we wanted," said Hâland. "So we went to the industry to engineer the new design, and paid for FEED and detailed engineering." Representatives of all relevant disciplines were invited to participate, including dr...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Offshore (Conroe, Tex.) Tex.), 2012-08, Vol.72 (8), p.32-34
1. Verfasser: TERDRE, Nick
Format: Magazinearticle
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:From the market we weren't getting the fit-for-purpose solution that we wanted," said Hâland. "So we went to the industry to engineer the new design, and paid for FEED and detailed engineering." Representatives of all relevant disciplines were invited to participate, including drilling contractors, hull and topside designers, equipment vendors, and fabricators. "We were very pleased to see their response," Hâland noted.
ISSN:0030-0608
2688-3295