A STUDY ON RAPID NATM TUNNEL DRIVING BY EARLY-HIGH-STRENGTH SHOTCRETE SUPPORT SYSTEM

Rapid tunnel driving largely contributes to reduction of construction cost and period. Therefore, the authors study rapid NATM tunnel driving for mechanical excavation applied to soft rock and inspected it in the tunnel site. The characteristic of this method is to adopt ‘early-high-strength shotcre...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Doboku Gakkai Ronbunshuu F 2010, Vol.66(3), pp.447-458
Hauptverfasser: KANAZAWA, Hiroshi, NISHI, Takahiko, NONOMURA, Masaichi, NISHIZAKI, Shoushi
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:Rapid tunnel driving largely contributes to reduction of construction cost and period. Therefore, the authors study rapid NATM tunnel driving for mechanical excavation applied to soft rock and inspected it in the tunnel site. The characteristic of this method is to adopt ‘early-high-strength shotcrete support system’ which contains shotcrete with the high strength at an early age without steel supports. The trial construction of rapid tunnel driving with this system has been executed in the Mineyama tunnel of the Shinkansen. This system has made it possible for the driving speed of the tunnel to be 304 m per month at the maximum. The result shows that rapid tunnel driving is practical and effective.
ISSN:1880-6074
1880-6074
DOI:10.2208/jscejf.66.447