A proposal on optimized scheduling methodology and its application to an actual-scale semiconductor manufacturing problem

Semiconductor manufacturing process flows typically include several hundred process steps, using hundreds of machines repeatedly. The production schedule for such a re-entrant flexible flow shop is extremely difficult to be optimized. Furthermore, in recent years, it has become increasingly difficul...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:CIRP annals 2012, Vol.61 (1), p.467-470
Hauptverfasser: Kaihara, Toshiya, Kurose, Shinji, Fujii, Nobutada
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:Semiconductor manufacturing process flows typically include several hundred process steps, using hundreds of machines repeatedly. The production schedule for such a re-entrant flexible flow shop is extremely difficult to be optimized. Furthermore, in recent years, it has become increasingly difficult to use machines effectively because of the product mix increase and also the production lot size decrease. In this paper we apply the well-known cooperative scheduling method, Lagrangian Decomposition and Coordination method, into an actual large scale model in semiconductor manufacturing. Then we show that the proposed method successfully creates a well-performed production schedule as we expected.
ISSN:0007-8506
DOI:10.1016/j.cirp.2012.03.077