Congestion-management schemes: a comparative analysis under a unified framework

The restructuring of the electricity industry has spawned the introduction of new independent grid operators (IGOs), typically called transmission system operators (TSOs); independent system operator (ISOs); or regional transmission organizations (RTOs), in various parts of the world. An important t...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:IEEE transactions on power systems 2003-02, Vol.18 (1), p.346-352
Hauptverfasser: Bompard, E., Correia, P., Gross, G., Amelin, M.
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The restructuring of the electricity industry has spawned the introduction of new independent grid operators (IGOs), typically called transmission system operators (TSOs); independent system operator (ISOs); or regional transmission organizations (RTOs), in various parts of the world. An important task of an IGO is congestion management (CM) and pricing. This activity has significant economic implications on every market participant in the IGO's region. The paper briefly reviews the CM schemes and the associated pricing mechanism used by the IGOs in five representative schemes. These were selected to illustrate the various CM approaches in use: England and Wales, Norway, Sweden, PJM, and California. The authors develop a unified framework for the mathematical representation of the market dispatch and redispatch problems that the IGO must solve in CM in these various jurisdictions. They use this unified framework to develop meaningful metrics to compare the various CM approaches so as to assess their efficiency and the effectiveness of the market signals provided to the market participants. They compare, using a small test system, side by side, the performance of these schemes.
ISSN:0885-8950
1558-0679
1558-0679
DOI:10.1109/TPWRS.2002.807077