Measurement of AT electric railway system currents at power-supply frequency and validation of a multiconductor transmission-line model
An electric traction system supplied at 2 /spl times/ 25 kV with autotransformers (ATs) is considered. The conductors' arrangement is that of the new European High Speed Railway Line (HSRL) under construction: The overhead supply conductors in contact with the train pantograph are connected to...
Gespeichert in:
Veröffentlicht in: | IEEE transactions on power delivery 2006-07, Vol.21 (3), p.1721-1726 |
---|---|
Hauptverfasser: | , , , , , , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Schreiben Sie den ersten Kommentar!