The rolling horizon procedure on deterministic lockage co-scheduling to the two dams of the Three Gorges Project
Purpose - The purpose of this paper is to propose a rolling horizon procedure (RHP) to deal with the large-scale and strongly NP-hard problem on cooperative lockage-timetables and service-policies of the five locks in the Three Gorges Project.Design methodology approach - RHP based approach is compo...
Gespeichert in:
Veröffentlicht in: | Kybernetes 2010-01, Vol.39 (8), p.1376-1383 |
---|---|
Hauptverfasser: | , , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | Purpose - The purpose of this paper is to propose a rolling horizon procedure (RHP) to deal with the large-scale and strongly NP-hard problem on cooperative lockage-timetables and service-policies of the five locks in the Three Gorges Project.Design methodology approach - RHP based approach is composed of a series of periodical short-time sub-optimizations instead of global optimization. Each of the sub-optimizations is modeled by a mixed-integer-programming and solved by a branch and bound algorithm with terminal penalty.Findings - The RHP method is found to be effective and efficient. The size of the rolling horizon is positively correlated to the total weighted area of ships.Research limitations implications - Precision of short-time predictions is the main limitation.Originality value - This procedure promotes the navigation capacity of the Three Gorges Project and proposes a solution to the lockage-scheduling problem of the Three Gorges Project. |
---|---|
ISSN: | 0368-492X 1758-7883 |
DOI: | 10.1108/03684921011063682 |