Preliminary Computations for Pulsed Reactor IBR-4. Basic Design

The IBR-2M reactor is scheduled for decommissioning at end of the 2030s. We propose, after the reactor is decommissioned, not to create an absolutely new neutron source, which would require significant R&D efforts, but use instead effective technical solutions tested at other fast neutron nuclea...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Physics of particles and nuclei letters 2024-08, Vol.21 (4), p.928-937
Hauptverfasser: Pepelyshev, Yu. N., Vinogradov, A. V., Rogov, A. D., Sumkhuu, D.
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The IBR-2M reactor is scheduled for decommissioning at end of the 2030s. We propose, after the reactor is decommissioned, not to create an absolutely new neutron source, which would require significant R&D efforts, but use instead effective technical solutions tested at other fast neutron nuclear facilities, for example, IBR-2, IBR-2M, MBIR, BOR-60, BN-1200, etc. This is a conceptual vision of a new source, the tentative name of which is IBR-4. The study based on calculations for the so-called basic setup of the IBR-4 considers the fundamental feasibility of implementing effective technical solutions.
ISSN:1547-4771
1531-8567
DOI:10.1134/S1547477124701024