Sequential solutions in machine scheduling games

We consider the classical machine scheduling, where n jobs need to be scheduled on m machines, and where job j scheduled on machine i contributes p ij ∈ R to the load of machine i , with the goal of minimizing the makespan, i.e., the maximum load of any machine in the schedule. We study the ineffici...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Journal of scheduling 2024-08, Vol.27 (4), p.363-373
Hauptverfasser: Chen, Cong, Giessler, Paul, Mamageishvili, Akaki, Mihalák, Matúš, Penna, Paolo
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:We consider the classical machine scheduling, where n jobs need to be scheduled on m machines, and where job j scheduled on machine i contributes p ij ∈ R to the load of machine i , with the goal of minimizing the makespan, i.e., the maximum load of any machine in the schedule. We study the inefficiency of schedules that are obtained when jobs arrive sequentially one by one, and the jobs choose the machine on which they will be scheduled, aiming at being scheduled on a machine with a small load. We measure the inefficiency of a schedule as the ratio of the makespan obtained in the worst-case equilibrium schedule, and of the optimum makespan. This ratio is known as the sequential price of anarchy ( SPoA ). We also introduce two alternative inefficiency measures, which allow for a favorable choice of the order in which the jobs make their decisions. As our first result, we disprove the conjecture of Hassin and Yovel (Oper Res Lett 43(5):530–533, 2015) claiming that the sequential price of anarchy for m = 2 machines is at most 3. We show that the sequential price of anarchy grows at least linearly with the number n of players, assuming arbitrary tie-breaking rules. That is, we show SPoA ∈ Ω ( n ) . At the end of the paper, we show that if an authority can change the order of the jobs adaptively to the decisions made by the jobs so far (but cannot influence the decisions of the jobs), then there exists an adaptive ordering in which the jobs end up in an optimum schedule.