Production-Routing-Inventory in Post-Disaster Conditions: a Multi-Objective Mathematical Model and Two Algorithms

The production-routing-inventory problem is a combination of three classic issues, routing, inventory, and lot sizing. Reviewing these issues together in the integrity of the supply chain is very important. On the other hand, to preserve the lives of affected people, before, during, and after a disa...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Process integration and optimization for sustainability 2022-12, Vol.6 (4), p.1163-1183
Hauptverfasser: Zargary, Shima, Samouei, Parvaneh
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The production-routing-inventory problem is a combination of three classic issues, routing, inventory, and lot sizing. Reviewing these issues together in the integrity of the supply chain is very important. On the other hand, to preserve the lives of affected people, before, during, and after a disaster, considering the crisis is a humanitarian affair. In this paper, we presented a bi-objective mixed-integer linear model. The first objective function minimized the cost of producing relief goods and holding inventory, and the second one minimized the time to get relief goods to the affected people. To solve the model, we used the GAMS software for small-sized problems and the simulated annealing (SA) and the bee colony (BC) algorithms for large-sized problems. Results showed that the SA and BC algorithms provided close answers, but the SA algorithm could achieve the results in less time than the BC algorithm.
ISSN:2509-4238
2509-4246
DOI:10.1007/s41660-022-00274-y