Data-Based Method for the Implementation Planning of Engineering Changes in the Automotive Industry

Each year, automotive OEMs implement a variety of Engineering Changes (ECs) in their production. In the timing of ECs, different KPIs are often in conflict with one another or even unknown to the OEMs. Therefore, OEMs struggle to identify the optimal date to implement an EC. This paper presents a me...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Proceedings of the Design Society 2022-05, Vol.2, p.343-352
Hauptverfasser: Capistrano Burgos, R., Sippl, F., Radisic-Aberger, O., Weisser, T.
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:Each year, automotive OEMs implement a variety of Engineering Changes (ECs) in their production. In the timing of ECs, different KPIs are often in conflict with one another or even unknown to the OEMs. Therefore, OEMs struggle to identify the optimal date to implement an EC. This paper presents a method to determine the cost-optimal implementation date for each EC, considering time, cost, and quality KPIs based on a new EC classification rule-set. To evaluate the presented method, case-studies at a German automotive OEM were performed, two of which are discussed.
ISSN:2732-527X
2732-527X
DOI:10.1017/pds.2022.36