Time Limit of Environmental Benefits of Renewable Energy Power Projects—Analysis Based on Monte Carlo Simulation
The supply of green electricity certificates (GECs) exceeds the demand, leading to companies being more willing to purchase GECs to meet their emission reduction obligations. However, concerns have been raised about the environmental impact of renewable energy (RE) projects labeled as “greenwashing”...
Gespeichert in:
Veröffentlicht in: | Sustainability 2023-10, Vol.15 (20), p.14687 |
---|---|
Hauptverfasser: | , , , , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The supply of green electricity certificates (GECs) exceeds the demand, leading to companies being more willing to purchase GECs to meet their emission reduction obligations. However, concerns have been raised about the environmental impact of renewable energy (RE) projects labeled as “greenwashing”. Drawing on the “additionality” theory, we developed a cost model with construction, operation, and discount rates. We utilized cost data from China’s onshore wind and photovoltaic power generation in our study. After 10,000 Monte Carlo simulations, we made the following findings: (1) The environmental benefits of RE power generation diminish over time, and the time limit for judging whether RE projects have additional costs compared with traditional thermal power should be considered; (2) The time limit for marginal environmental effects of China’s onshore wind and photovoltaic power generation is estimated to be 7.65–10.78 years and 5.44–7.25 years, respectively. The analysis methods and ideas proposed in this paper can provide reference for the development of the GEC system in China and even other countries. |
---|---|
ISSN: | 2071-1050 2071-1050 |
DOI: | 10.3390/su152014687 |