Construction Management Information System at JINR

The deployment and adaptation of an all-around Construction Management Information System (CMIS) was recently completed at the Joint Institute for Nuclear Research (JINR) from the collaborative work of the Laboratory of High Energy Physics (LHEP) and the Laboratory of Information Technologies (LIT)....

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Physics of particles and nuclei letters 2023-10, Vol.20 (5), p.981-987
Hauptverfasser: Ceballos, C., Kolozhvari, A. A., Dolbilov, A. G., Semenov, R. N., Tsapulina, E. A., Rodriguez, A., Sheremetiev, A. D., Murin, Yu. A.
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The deployment and adaptation of an all-around Construction Management Information System (CMIS) was recently completed at the Joint Institute for Nuclear Research (JINR) from the collaborative work of the Laboratory of High Energy Physics (LHEP) and the Laboratory of Information Technologies (LIT). The system is particularly useful for the fine-grained control and continuous feedback of the production of complex multipart objects like the detector subsystems composing the experiments of the Nuclotron-based Ion Collider fAcility (NICA) at JINR’s LHEP. Currently, the CMIS is used for the production of two different silicon tracker detectors at the LHEP, although it might as well be used by any other hardware production projects related to JINR whose complexity would make it very hard to fulfill their quality and timing requirements otherwise.
ISSN:1547-4771
1531-8567
DOI:10.1134/S1547477123050187