Revisit the scheduling problem with assignable or generalized due dates to minimize total weighted late work

We revisit the single-machine scheduling for minimising the total weighted late work with assignable due dates (ADD-scheduling) and generalised due dates (GDD-scheduling). In particular, we consider the following three problems: (i) the GDD-scheduling problem for minimising the total weighted late w...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:International journal of production research 2023-11, Vol.61 (22), p.7630-7648
Hauptverfasser: Chen, Rubing, Gao, Yuan, Geng, Zhichao, Yuan, Jinjiang
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:We revisit the single-machine scheduling for minimising the total weighted late work with assignable due dates (ADD-scheduling) and generalised due dates (GDD-scheduling). In particular, we consider the following three problems: (i) the GDD-scheduling problem for minimising the total weighted late work, (ii) the ADD-scheduling problem for minimising the total weighted late work, and (iii) the ADD-scheduling problem for minimising the total late work. In the literature, the above three problems are proved to be NP-hard, but their exact complexity (unary NP-hardness or pseudo-polynomial-time solvability) are unknown. In this paper, we address these open problems by showing that the first two problems are unary NP-hard and the third problem admits pseudo-polynomial-time algorithms. For the third problem, we also present a 2-approximation solution and a fully polynomial-time approximation scheme. Computational experiments show that our algorithms and solutions are efficient. When the jobs have identical processing times, we further present more efficient polynomial-time algorithms.
ISSN:0020-7543
1366-588X
DOI:10.1080/00207543.2022.2160502