Generator capacity predictor system modeling using decision tree regressor at PT Saka Indonesia Pangkah Limited
Machine learning model can be used to predict gas turbine generator capacity at PT Saka Energi Pangkah Limited as the foundation of anomaly detector system. Previous research shown that the using of ANN model resulting adequate performance to predict gas turbine generator. However, the using of ANN...
Gespeichert in:
Hauptverfasser: | , , , , |
---|---|
Format: | Tagungsbericht |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | Machine learning model can be used to predict gas turbine generator capacity at PT Saka Energi Pangkah Limited as the foundation of anomaly detector system. Previous research shown that the using of ANN model resulting adequate performance to predict gas turbine generator. However, the using of ANN in the plant has several drawbacks for example high cost computation, low accuracy and precision. In this research, machine learning approach were selected to improve performance of the predictor model. Decision tree regressor is one of many machine learning models which can also can be used to predict gas turbine generator capacity. The test results show that the best model using decision tree regressor is obtained by providing a data ratio for training and testing of 70:30 (type-3) with an MAE value of 0.821, MSE of 1.329, R2 of 0.998, EVS of 0.998 and RMSE of 1.115. |
---|---|
ISSN: | 0094-243X 1551-7616 |
DOI: | 10.1063/5.0136775 |