Research on Power Transmission Tower Planning Method Based on Real Terrain and Surface Feature
With the rapid development of power grid construction in China, the engineering construction conditions of overhead lines have changed. Further research is needed on the combination scheme of general design technical conditions of lines, tower planning, and design, etc., to meet the application requ...
Gespeichert in:
Veröffentlicht in: | Journal of physics. Conference series 2023-05, Vol.2503 (1), p.12028 |
---|---|
Hauptverfasser: | , , , , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | With the rapid development of power grid construction in China, the engineering construction conditions of overhead lines have changed. Further research is needed on the combination scheme of general design technical conditions of lines, tower planning, and design, etc., to meet the application requirements of the actual line projects in China for the general design of transmission line towers. This research adopts the pole and tower planning method that conforms to the real terrain and terrain conditions and considers the actual constraint information, such as the terrain, crossing trees, power lines, and railways, to carry out the planning and design of transmission line poles and towers. |
---|---|
ISSN: | 1742-6588 1742-6596 |
DOI: | 10.1088/1742-6596/2503/1/012028 |