Problems and solutions to improve delivery times of cargo

This article analyzes the main factors that cause local wagons to stay on the rail when it comes to freight wagons and develops technological processes for processing trains on technical stations. A formula for determining the total number of shipments from the station is also proposed. The interrel...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: Kobulov, J. R., Barotov, J. S., Tursunkhodjayeva, R. Y., Tashmatova, M. S.
Format: Tagungsbericht
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:This article analyzes the main factors that cause local wagons to stay on the rail when it comes to freight wagons and develops technological processes for processing trains on technical stations. A formula for determining the total number of shipments from the station is also proposed. The interrelation of the operations carried out during the interval between train departure stations to the established stations, and the method of finding the overestimated hours during the operation of inter-sectional distance. The authors have developed a formula for determining the total number of operations from train stations to the designated stations and an algorithm for calculating rail carriages from station to station.
ISSN:0094-243X
1551-7616
DOI:10.1063/5.0131234