Aumento de disponibilidad en equipos de una empresa de polímeros enfocado en el método RCM
The results obtained were satisfactory and relevant, since the average availability increase of 91.66% was presented in the critical machines evaluated (mincer, crusher and extruder) and in line two of pelletizing, managing to apply an effective maintenance plan and viable to increase the availabili...
Gespeichert in:
Veröffentlicht in: | RISTI : Revista Ibérica de Sistemas e Tecnologias de Informação 2022-08 (E52), p.148-160 |
---|---|
Hauptverfasser: | , , , |
Format: | Artikel |
Sprache: | por ; spa |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | 160 |
---|---|
container_issue | E52 |
container_start_page | 148 |
container_title | RISTI : Revista Ibérica de Sistemas e Tecnologias de Informação |
container_volume | |
creator | Vidaurre, Jhon Pio, Melissa Reyes, Rebeca Quispe, Grimaldo |
description | The results obtained were satisfactory and relevant, since the average availability increase of 91.66% was presented in the critical machines evaluated (mincer, crusher and extruder) and in line two of pelletizing, managing to apply an effective maintenance plan and viable to increase the availability of equipment in the organization. Keywords: Reliability, Reliability, Maintenance management 1.Introducción En el Perú las medianas y pequeñas empresas contribuyen al 42% del PBI, siendo motor del impulso económico y la generación de empleo. Se desarrolló el análisis del diagrama Ishikawa en el cual el primer problema que obtuvimos fue la baja disponibilidad en la línea 2, luego de ello se procedió una matriz de criticidad y disponibilidad en donde se analizará el factor de mayor ponderación y precisión para ver la disponibilidad, mediante el diagrama Pareto se obtuvo los siguientes resultados A) Falta de mantenimiento, B) Falta de capacitación al operario de producción, C) Dificultad para acceder a repuestos, D)Falta de inspección durante los procesos de fabricación, E)Desorden de las herramientas y materiales de trabajo, F) Falta de indicadores, 2.1.Pasos de implementáción de la metodología RCM Moubray J, 2004 menciona los siete pasos para implementar un mantenimiento centrado en la confiabilidad (RCM). De esta manera, la base de datos de falla OREDA (Offshore Reliability & Data Handbook) nos permitirá evaluar las posibles fallas de la maquinaria existente, trayendo consigo la poca disponibilidad de estas lo que ocasionan cuellos de botella en el ciclo productivo teniendo en cuenta los criterios del NPR (Número de Prioridad de Riesgo). |
format | Article |
fullrecord | <record><control><sourceid>proquest</sourceid><recordid>TN_cdi_proquest_journals_2758392122</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>2758392122</sourcerecordid><originalsourceid>FETCH-LOGICAL-p98t-c5309e7c1b3e500b3a144da7516572110a626e00fb00524f2b13f50a3e748c983</originalsourceid><addsrcrecordid>eNotTktqwzAU1CKFhjR3EHRt0N_SMpj0AymFkmUhyNYzONiSYlmH6qKnyMWqtJ3NMAzzWaE1VUJVRht5j7YpnUmBJNxotkafuzyBXwJ2gN2QYvBDO4yDsw6Dx3DJQwzpZmZvMUxxhmRvMobx-j3BXEzwfeisC7-BEU_XryUU9dG8PaC73o4Jtv-8Qcen_bF5qQ7vz6_N7lBFo5eqk5wYqDvacpCEtNxSIZytJVWyZpQSq5gCQvq23GaiZy3lvSSWQy10ZzTfoMe_2jiHS4a0nM4hz74snlgtNTeMMsZ_AEc2Tsg</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype><pqid>2758392122</pqid></control><display><type>article</type><title>Aumento de disponibilidad en equipos de una empresa de polímeros enfocado en el método RCM</title><source>EZB-FREE-00999 freely available EZB journals</source><creator>Vidaurre, Jhon ; Pio, Melissa ; Reyes, Rebeca ; Quispe, Grimaldo</creator><creatorcontrib>Vidaurre, Jhon ; Pio, Melissa ; Reyes, Rebeca ; Quispe, Grimaldo</creatorcontrib><description>The results obtained were satisfactory and relevant, since the average availability increase of 91.66% was presented in the critical machines evaluated (mincer, crusher and extruder) and in line two of pelletizing, managing to apply an effective maintenance plan and viable to increase the availability of equipment in the organization. Keywords: Reliability, Reliability, Maintenance management 1.Introducción En el Perú las medianas y pequeñas empresas contribuyen al 42% del PBI, siendo motor del impulso económico y la generación de empleo. Se desarrolló el análisis del diagrama Ishikawa en el cual el primer problema que obtuvimos fue la baja disponibilidad en la línea 2, luego de ello se procedió una matriz de criticidad y disponibilidad en donde se analizará el factor de mayor ponderación y precisión para ver la disponibilidad, mediante el diagrama Pareto se obtuvo los siguientes resultados A) Falta de mantenimiento, B) Falta de capacitación al operario de producción, C) Dificultad para acceder a repuestos, D)Falta de inspección durante los procesos de fabricación, E)Desorden de las herramientas y materiales de trabajo, F) Falta de indicadores, 2.1.Pasos de implementáción de la metodología RCM Moubray J, 2004 menciona los siete pasos para implementar un mantenimiento centrado en la confiabilidad (RCM). De esta manera, la base de datos de falla OREDA (Offshore Reliability & Data Handbook) nos permitirá evaluar las posibles fallas de la maquinaria existente, trayendo consigo la poca disponibilidad de estas lo que ocasionan cuellos de botella en el ciclo productivo teniendo en cuenta los criterios del NPR (Número de Prioridad de Riesgo).</description><identifier>ISSN: 1646-9895</identifier><language>por ; spa</language><publisher>Lousada: Associação Ibérica de Sistemas e Tecnologias de Informacao</publisher><subject>Availability ; Maintenance management ; Pelleting ; Project management ; Reliability</subject><ispartof>RISTI : Revista Ibérica de Sistemas e Tecnologias de Informação, 2022-08 (E52), p.148-160</ispartof><rights>2022. This work is published under https://creativecommons.org/licenses/by-nc-sa/4.0/ (the “License”). Notwithstanding the ProQuest Terms and Conditions, you may use this content in accordance with the terms of the License.</rights><lds50>peer_reviewed</lds50><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><link.rule.ids>314,780,784</link.rule.ids></links><search><creatorcontrib>Vidaurre, Jhon</creatorcontrib><creatorcontrib>Pio, Melissa</creatorcontrib><creatorcontrib>Reyes, Rebeca</creatorcontrib><creatorcontrib>Quispe, Grimaldo</creatorcontrib><title>Aumento de disponibilidad en equipos de una empresa de polímeros enfocado en el método RCM</title><title>RISTI : Revista Ibérica de Sistemas e Tecnologias de Informação</title><description>The results obtained were satisfactory and relevant, since the average availability increase of 91.66% was presented in the critical machines evaluated (mincer, crusher and extruder) and in line two of pelletizing, managing to apply an effective maintenance plan and viable to increase the availability of equipment in the organization. Keywords: Reliability, Reliability, Maintenance management 1.Introducción En el Perú las medianas y pequeñas empresas contribuyen al 42% del PBI, siendo motor del impulso económico y la generación de empleo. Se desarrolló el análisis del diagrama Ishikawa en el cual el primer problema que obtuvimos fue la baja disponibilidad en la línea 2, luego de ello se procedió una matriz de criticidad y disponibilidad en donde se analizará el factor de mayor ponderación y precisión para ver la disponibilidad, mediante el diagrama Pareto se obtuvo los siguientes resultados A) Falta de mantenimiento, B) Falta de capacitación al operario de producción, C) Dificultad para acceder a repuestos, D)Falta de inspección durante los procesos de fabricación, E)Desorden de las herramientas y materiales de trabajo, F) Falta de indicadores, 2.1.Pasos de implementáción de la metodología RCM Moubray J, 2004 menciona los siete pasos para implementar un mantenimiento centrado en la confiabilidad (RCM). De esta manera, la base de datos de falla OREDA (Offshore Reliability & Data Handbook) nos permitirá evaluar las posibles fallas de la maquinaria existente, trayendo consigo la poca disponibilidad de estas lo que ocasionan cuellos de botella en el ciclo productivo teniendo en cuenta los criterios del NPR (Número de Prioridad de Riesgo).</description><subject>Availability</subject><subject>Maintenance management</subject><subject>Pelleting</subject><subject>Project management</subject><subject>Reliability</subject><issn>1646-9895</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2022</creationdate><recordtype>article</recordtype><sourceid>ABUWG</sourceid><sourceid>AFKRA</sourceid><sourceid>AZQEC</sourceid><sourceid>BENPR</sourceid><sourceid>CCPQU</sourceid><sourceid>DWQXO</sourceid><sourceid>GNUQQ</sourceid><recordid>eNotTktqwzAU1CKFhjR3EHRt0N_SMpj0AymFkmUhyNYzONiSYlmH6qKnyMWqtJ3NMAzzWaE1VUJVRht5j7YpnUmBJNxotkafuzyBXwJ2gN2QYvBDO4yDsw6Dx3DJQwzpZmZvMUxxhmRvMobx-j3BXEzwfeisC7-BEU_XryUU9dG8PaC73o4Jtv-8Qcen_bF5qQ7vz6_N7lBFo5eqk5wYqDvacpCEtNxSIZytJVWyZpQSq5gCQvq23GaiZy3lvSSWQy10ZzTfoMe_2jiHS4a0nM4hz74snlgtNTeMMsZ_AEc2Tsg</recordid><startdate>20220801</startdate><enddate>20220801</enddate><creator>Vidaurre, Jhon</creator><creator>Pio, Melissa</creator><creator>Reyes, Rebeca</creator><creator>Quispe, Grimaldo</creator><general>Associação Ibérica de Sistemas e Tecnologias de Informacao</general><scope>3V.</scope><scope>7XB</scope><scope>8AL</scope><scope>8FE</scope><scope>8FG</scope><scope>8FK</scope><scope>ABUWG</scope><scope>AFKRA</scope><scope>ARAPS</scope><scope>AZQEC</scope><scope>BENPR</scope><scope>BFMQW</scope><scope>BGLVJ</scope><scope>CCPQU</scope><scope>CLZPN</scope><scope>DWQXO</scope><scope>GNUQQ</scope><scope>HCIFZ</scope><scope>JQ2</scope><scope>K7-</scope><scope>M0N</scope><scope>P5Z</scope><scope>P62</scope><scope>PIMPY</scope><scope>PQEST</scope><scope>PQQKQ</scope><scope>PQUKI</scope><scope>PRINS</scope><scope>Q9U</scope></search><sort><creationdate>20220801</creationdate><title>Aumento de disponibilidad en equipos de una empresa de polímeros enfocado en el método RCM</title><author>Vidaurre, Jhon ; Pio, Melissa ; Reyes, Rebeca ; Quispe, Grimaldo</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-p98t-c5309e7c1b3e500b3a144da7516572110a626e00fb00524f2b13f50a3e748c983</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>por ; spa</language><creationdate>2022</creationdate><topic>Availability</topic><topic>Maintenance management</topic><topic>Pelleting</topic><topic>Project management</topic><topic>Reliability</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Vidaurre, Jhon</creatorcontrib><creatorcontrib>Pio, Melissa</creatorcontrib><creatorcontrib>Reyes, Rebeca</creatorcontrib><creatorcontrib>Quispe, Grimaldo</creatorcontrib><collection>ProQuest Central (Corporate)</collection><collection>ProQuest Central (purchase pre-March 2016)</collection><collection>Computing Database (Alumni Edition)</collection><collection>ProQuest SciTech Collection</collection><collection>ProQuest Technology Collection</collection><collection>ProQuest Central (Alumni) (purchase pre-March 2016)</collection><collection>ProQuest Central (Alumni Edition)</collection><collection>ProQuest Central UK/Ireland</collection><collection>Advanced Technologies & Aerospace Collection</collection><collection>ProQuest Central Essentials</collection><collection>ProQuest Central</collection><collection>Continental Europe Database</collection><collection>Technology Collection</collection><collection>ProQuest One Community College</collection><collection>Latin America & Iberia Database</collection><collection>ProQuest Central Korea</collection><collection>ProQuest Central Student</collection><collection>SciTech Premium Collection</collection><collection>ProQuest Computer Science Collection</collection><collection>Computer Science Database</collection><collection>Computing Database</collection><collection>Advanced Technologies & Aerospace Database</collection><collection>ProQuest Advanced Technologies & Aerospace Collection</collection><collection>Publicly Available Content Database</collection><collection>ProQuest One Academic Eastern Edition (DO NOT USE)</collection><collection>ProQuest One Academic</collection><collection>ProQuest One Academic UKI Edition</collection><collection>ProQuest Central China</collection><collection>ProQuest Central Basic</collection><jtitle>RISTI : Revista Ibérica de Sistemas e Tecnologias de Informação</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Vidaurre, Jhon</au><au>Pio, Melissa</au><au>Reyes, Rebeca</au><au>Quispe, Grimaldo</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Aumento de disponibilidad en equipos de una empresa de polímeros enfocado en el método RCM</atitle><jtitle>RISTI : Revista Ibérica de Sistemas e Tecnologias de Informação</jtitle><date>2022-08-01</date><risdate>2022</risdate><issue>E52</issue><spage>148</spage><epage>160</epage><pages>148-160</pages><issn>1646-9895</issn><abstract>The results obtained were satisfactory and relevant, since the average availability increase of 91.66% was presented in the critical machines evaluated (mincer, crusher and extruder) and in line two of pelletizing, managing to apply an effective maintenance plan and viable to increase the availability of equipment in the organization. Keywords: Reliability, Reliability, Maintenance management 1.Introducción En el Perú las medianas y pequeñas empresas contribuyen al 42% del PBI, siendo motor del impulso económico y la generación de empleo. Se desarrolló el análisis del diagrama Ishikawa en el cual el primer problema que obtuvimos fue la baja disponibilidad en la línea 2, luego de ello se procedió una matriz de criticidad y disponibilidad en donde se analizará el factor de mayor ponderación y precisión para ver la disponibilidad, mediante el diagrama Pareto se obtuvo los siguientes resultados A) Falta de mantenimiento, B) Falta de capacitación al operario de producción, C) Dificultad para acceder a repuestos, D)Falta de inspección durante los procesos de fabricación, E)Desorden de las herramientas y materiales de trabajo, F) Falta de indicadores, 2.1.Pasos de implementáción de la metodología RCM Moubray J, 2004 menciona los siete pasos para implementar un mantenimiento centrado en la confiabilidad (RCM). De esta manera, la base de datos de falla OREDA (Offshore Reliability & Data Handbook) nos permitirá evaluar las posibles fallas de la maquinaria existente, trayendo consigo la poca disponibilidad de estas lo que ocasionan cuellos de botella en el ciclo productivo teniendo en cuenta los criterios del NPR (Número de Prioridad de Riesgo).</abstract><cop>Lousada</cop><pub>Associação Ibérica de Sistemas e Tecnologias de Informacao</pub><tpages>13</tpages><oa>free_for_read</oa></addata></record> |
fulltext | fulltext |
identifier | ISSN: 1646-9895 |
ispartof | RISTI : Revista Ibérica de Sistemas e Tecnologias de Informação, 2022-08 (E52), p.148-160 |
issn | 1646-9895 |
language | por ; spa |
recordid | cdi_proquest_journals_2758392122 |
source | EZB-FREE-00999 freely available EZB journals |
subjects | Availability Maintenance management Pelleting Project management Reliability |
title | Aumento de disponibilidad en equipos de una empresa de polímeros enfocado en el método RCM |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-01T04%3A50%3A37IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-proquest&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Aumento%20de%20disponibilidad%20en%20equipos%20de%20una%20empresa%20de%20pol%C3%ADmeros%20enfocado%20en%20el%20m%C3%A9todo%20RCM&rft.jtitle=RISTI%20:%20Revista%20Ib%C3%A9rica%20de%20Sistemas%20e%20Tecnologias%20de%20Informa%C3%A7%C3%A3o&rft.au=Vidaurre,%20Jhon&rft.date=2022-08-01&rft.issue=E52&rft.spage=148&rft.epage=160&rft.pages=148-160&rft.issn=1646-9895&rft_id=info:doi/&rft_dat=%3Cproquest%3E2758392122%3C/proquest%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_pqid=2758392122&rft_id=info:pmid/&rfr_iscdi=true |