Upgrade of the Neutral Beam Injection System on EAST
The experimental advanced superconducting tokamak (EAST) is one of the fully superconducting tokamaks. A high-power neutral beam injector (NBI) system consisting of two injectors (EAST-NBI) was employed on EAST for plasma heating and current driving. The designed deuterium beam energy is 50-80 keV,...
Gespeichert in:
Veröffentlicht in: | IEEE transactions on plasma science 2022-11, Vol.50 (11), p.4086-4090 |
---|---|
Hauptverfasser: | , , , , , , , , , , , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The experimental advanced superconducting tokamak (EAST) is one of the fully superconducting tokamaks. A high-power neutral beam injector (NBI) system consisting of two injectors (EAST-NBI) was employed on EAST for plasma heating and current driving. The designed deuterium beam energy is 50-80 keV, beam power is 2-4 MW, and the beam duration is 10-100 s. Each beamline is equipped with two hot cathode ion sources and can be operated individually. In order to support the planned physics research on EAST, the NBI-2 was shifted from port F to port D, and at the same time, its injection direction was changed from counter-injection to co-injection. Furthermore, the high power ion source was optimized with better feedback control for stable long pulse beam, and a new technology of beam re-turn on was also developed and applied aiming at long pulse beam injection. Details of the NBI status will be presented in this article. |
---|---|
ISSN: | 0093-3813 1939-9375 |
DOI: | 10.1109/TPS.2022.3164682 |