Switched max-plus linear-dual inequalities for makespan minimization: the case study of an industrial bakery shop

In this paper, an industrial bakery shop is modeled by switched max-plus linear-dual inequalities (SLDIs). SLDIs are timed discrete event systems suitable for describing flow shops with time-window constraints and switching operating modes, where each mode corresponds to a job type. We consider the...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:arXiv.org 2023-05
Hauptverfasser: Zorzenon, Davide, Zaiets, Nataliia, Raisch, Jörg
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:In this paper, an industrial bakery shop is modeled by switched max-plus linear-dual inequalities (SLDIs). SLDIs are timed discrete event systems suitable for describing flow shops with time-window constraints and switching operating modes, where each mode corresponds to a job type. We consider the scheduling problem of minimizing the makespan of the shop, and we show that the application of methods based on the max-plus algebra leads to a faster solution compared to standard techniques. The results of the paper are general, in the sense that they can be applied to any permutation flow shop with time-window constraints.
ISSN:2331-8422