Improvement of operational efficiency of high water-cut oil wells
This paper describes a new algorithm for selecting candidate wells for water shut-off works. A new comprehensive methodology for the selection of candidate wells for water shut-off technology is proposed, consisting of 4 stages, where wells with excessive water cut are identified. The reasons for th...
Gespeichert in:
Veröffentlicht in: | IOP conference series. Earth and environmental science 2022-05, Vol.1021 (1), p.12077 |
---|---|
Hauptverfasser: | , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | This paper describes a new algorithm for selecting candidate wells for water shut-off works. A new comprehensive methodology for the selection of candidate wells for water shut-off technology is proposed, consisting of 4 stages, where wells with excessive water cut are identified. The reasons for the water cut are determined, and the effectiveness of water shut-off technology on a potential candidate well is substantiated and predicted. The proposed method has been tested by the example of two wells in terrigenous reservoirs of a gas-oil field. |
---|---|
ISSN: | 1755-1307 1755-1315 |
DOI: | 10.1088/1755-1315/1021/1/012077 |