PIP2-BD: GeV Proton Beam Dump at Fermilab's PIP-II Linac
The PIP-II superconducting RF linac is currently under construction at Fermilab and is expected to be completed by the end of 2028. PIP-II is capable of operating in a continuous-wave mode and can concurrently supply 800 MeV protons to a mega-watt, GeV-scale beam dump facility and to LBNF/DUNE. Desi...
Gespeichert in:
Veröffentlicht in: | arXiv.org 2022-09 |
---|---|
Hauptverfasser: | , , , , , , , , , , , , , , , , , , , , , , , , , , , , , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The PIP-II superconducting RF linac is currently under construction at Fermilab and is expected to be completed by the end of 2028. PIP-II is capable of operating in a continuous-wave mode and can concurrently supply 800 MeV protons to a mega-watt, GeV-scale beam dump facility and to LBNF/DUNE. Designs for proton accumulator rings are being studied to bunch the PIP-II protons into the short pulses needed for neutrino and low-mass dark matter experiments. PIP2-BD is a proposed 100-ton LAr scintillation-only experiment, whose detector design is inspired by CENNS-10 and CCM, that would have world-leading sensitivities to BSM physics, including low-mass dark matter produced in the PIP-II proton beam dump. |
---|---|
ISSN: | 2331-8422 |