Periodic replacement policies with shortage and excess costs

It has been proposed that if replacement time is planned too early prior to failure, a waste of operation cost, i.e., excess costs, would incur because the system might run for an additional period of time to complete critical operations, and if replacement time is too late after failure, a great fa...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Annals of operations research 2022-04, Vol.311 (1), p.469-487
Hauptverfasser: Zhao, Xufeng, Chen, Mingchih, Nakagawa, Toshio
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:It has been proposed that if replacement time is planned too early prior to failure, a waste of operation cost, i.e., excess costs, would incur because the system might run for an additional period of time to complete critical operations, and if replacement time is too late after failure, a great failure cost, i.e., shortage cost, is incurred due to the delay in time of the carelessly scheduled replacement. In order to make the preventive replacement policies perform in a more general way, the above two variable types of costs are taken into considerations for periodic replacement policies in this paper. We firstly take up a standard model in which the unit is replaced preventively at periodic times. Secondly, the modeling approaches of whichever occurs first and last are applied into periodic and random models, and replacement first and last policies are discussed to find optimum periodic replacement times for a random working time. Furthermore, optimum working numbers are obtained for the extended models. We give analytical discussions of the above replacement policies, and finally, numerical examples are illustrated.
ISSN:0254-5330
1572-9338
DOI:10.1007/s10479-020-03566-z