Production Bottleneck Prediction of Multi-Variety and Small Batch Production Workshop

Aiming at the bottleneck dynamic drift problem of production line, a dynamic bottleneck prediction method based on Markov chain was proposed to predict the bottleneck before the bottleneck appeared and predict the bottleneck change state. First, Markov state probability transition matrix is determin...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Journal of physics. Conference series 2022-02, Vol.2187 (1), p.12057
Hauptverfasser: Lin, Shuo, Liu, Junhui, Li, Shishi
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:Aiming at the bottleneck dynamic drift problem of production line, a dynamic bottleneck prediction method based on Markov chain was proposed to predict the bottleneck before the bottleneck appeared and predict the bottleneck change state. First, Markov state probability transition matrix is determined by analyzing the past data. Second, the current operation state of the process is brought into the Markov chain to calculate the probability of each process bottleneck at the next moment. Finally, the bottleneck index model is used to accurately locate the bottleneck location, and then get the exact bottleneck process.
ISSN:1742-6588
1742-6596
DOI:10.1088/1742-6596/2187/1/012057