Construction and commissioning of direct beam transport line for PF-AR

PF-AR was constructed as an accumulator ring for TRISTAN, and in the KEKB era it has been revitalized as a 6.5 GeV synchrotron radiation source. The injection energy was 3 GeV and the beam was accelerated to 6.5 GeV prior to the user run. The original beam transport line (BT) from the LINAC to the P...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Journal of physics. Conference series 2017-07, Vol.874 (1), p.12024
Hauptverfasser: Higashi, Nao, Asaoka, Seiji, Furukawa, Kazuro, Haga, Kaiichi, Harada, Kentaro, Higo, Toshiyasu, Honda, Tohru, Honma, Hiroyuki, Iida, Naoko, Iwase, Hiroshi, Kakihara, Kazuhisa, Kamitani, Takuya, Kikuchi, Mitsuo, Kishimoto, Yuji, Kobayashi, Yukinori, Kodama, Kota, Kudo, Kikuo, Kume, Tatsuya, Mikawa, Katsuhiko, Mimashi, Toshihiro, Miyahara, Fusashi, Miyauchi, Hiroshi, Nagahashi, Shinya, Nakamura, Hajime, Nakamura, Norio, Natsui, Takuya, Nigorikawa, Kazuyuki, Niwa, Yasuhiro, Nogami, Takashi, Obina, Takashi, Ogawa, Yujiro, Ono, Masaaki, Ozaki, Toshiyuki, Sagehashi, Hidenori, Sanami, Toshiya, Sato, Masayuki, Satoh, Masanori, Suwada, Tsuyoshi, Tadano, Mikito, Tahara, Toshihiro, Takai, Ryota, Takaki, Hiroyuki, Takasaki, Seiji, Tanaka, Madoka, Tanimoto, Yasunori, Tawada, Masafumi, Toge, Nobu, Uchiyama, Takashi, Ueda, Akira, Yamada, Yusuke, Yamamoto, Masahiro, Yoshida, Mitsuhiro
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:PF-AR was constructed as an accumulator ring for TRISTAN, and in the KEKB era it has been revitalized as a 6.5 GeV synchrotron radiation source. The injection energy was 3 GeV and the beam was accelerated to 6.5 GeV prior to the user run. The original beam transport line (BT) from the LINAC to the PF-AR shared its upstream part with the the BT line of KEKB High Energy Ring (HER). The injection-mode change from PF-AR to HER or vice versa needs about 10 minutes for the magnet cycling procedure of the shared part. In SuperKEKB, the upgrade of KEKB, the lifetime of HER is about 10 minutes. The mode-switch operation of the BT is, therefore, not allowed for maintaining the highest luminosity of the SuperKEKB. In order to avoid this problem, a new 6.5 GeV BT line dedicated to PF-AR has been constructed. This also enables the top-up injection for the user run. The commissioning of the new BT line has been completed in this March, and now the first user run has been operated successfully.
ISSN:1742-6588
1742-6596
DOI:10.1088/1742-6596/874/1/012024