Estimating the marginal cost of reducing power outage durations in China: A parametric distance function approach

The increasing penetration of intermittent renewables and the accelerated climate change are challenging the power system operation in China, and understanding the cost of reducing power outage durations is essential in supporting the equipment maintenance, infrastructure investments and regulation...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Energy policy 2021-08, Vol.155, p.112366, Article 112366
Hauptverfasser: Chen, Hao, Chen, Xi, Niu, Jinye, Xiang, Mengyu, He, Weijun, Küfeoğlu, Sinan
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The increasing penetration of intermittent renewables and the accelerated climate change are challenging the power system operation in China, and understanding the cost of reducing power outage durations is essential in supporting the equipment maintenance, infrastructure investments and regulation policies. Therefore, this study first uses production theory combined with a parametric distance function approach to estimate the marginal costs (MCs) of reducing power outage durations by 1 h. Then, we establish a fixed-effects panel data model to investigate the impacts of different environmental factors on the estimated MCs. Finally, the estimated MCs are applied to the evaluations and designs of interruption compensation prices in the demand response mechanism. The significant findings are that: (1) The national MC shows an increasing trend during the period from 2002 to 2017 in China, ranging from 1.27 billion yuan/hour to 11.63 billion yuan/hour. (2) The MCs vary substantially among different provinces, and provinces with better reliability levels will have higher MCs. (3) The current compensations for power outages are only about 6% to 61% of the estimated MCs, indicating that grid companies would like to pay for the compensations rather than to enhance the system reliability from the supply side. •The cost of reducing power outage durations are estimated.•Reducing 1-h of outage cost 9.66 billion yuan in 2017.•Provinces with lower reliability have higher outage cost.•The impacts of environmental factors on the cost are analyzed.•The current compensations for outages are insufficient.
ISSN:0301-4215
1873-6777
DOI:10.1016/j.enpol.2021.112366