Evaluation of power plant reliability using index loss of load in the Suralaya power plant

Suralaya Power Plant (SPP) is the largest capable electricity generation company in Indonesia, with a total installed capacity of 3400 MW. As the largest power plant in Indonesia, SPP holds a great responsibility as a supplier 17% of the electricity needs of the Java, Madura and Bali (JAMALI) system...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:IOP conference series. Materials Science and Engineering 2020-12, Vol.909 (1), p.12070
Hauptverfasser: Ferro Ferdinant, Putro, Nurdiana, Laila, Irman, Ade
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:Suralaya Power Plant (SPP) is the largest capable electricity generation company in Indonesia, with a total installed capacity of 3400 MW. As the largest power plant in Indonesia, SPP holds a great responsibility as a supplier 17% of the electricity needs of the Java, Madura and Bali (JAMALI) systems. This makes the SPP also one of the national vital objects (Obvitnas). This paper will calculate the reliability index of the generator using the method of loss of load probability (LOLP) and loss of load expectation (LOLE) based on the value of the force outage rate (FOR). Based on data on failure and daily expenses in 2019, the reliability index of SPP for units 1-4 is 4,23 days per year or 1,23%. The higher values LOLP/LOLE are in 2019 are possibility of SPP has lost its burden for 2 days in a period of 2019 because of force majeure (blackout) which causes a reduced load. To improve power plant is that the electricity load in West Java can be fulfilled with the electricity flow.
ISSN:1757-8981
1757-899X
DOI:10.1088/1757-899X/909/1/012070