Analysis of time acceleration using Critical Path Method (CPM) to increase motorcycle maintenance in authorized service station

Numerous studies have shown that maintenance requires proper scheduling by using preventive and corrective maintenance scheduling to maintain the state of the machine. The fact is the number of Honda motorcycle products has increased. This has resulted in a long motorcycle queue. Motorcycle queues c...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:IOP conference series. Materials Science and Engineering 2020-07, Vol.885 (1), p.12059
Hauptverfasser: Marit, I Y, Nursanti, E, Vitasari, P
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:Numerous studies have shown that maintenance requires proper scheduling by using preventive and corrective maintenance scheduling to maintain the state of the machine. The fact is the number of Honda motorcycle products has increased. This has resulted in a long motorcycle queue. Motorcycle queues cannot be prevented only by scheduling preventive and corrective maintenance, so scheduling of maintenance activities is necessity to speed up motorcycle maintenance time. This study uses the Critical Path Method (CPM) activity scheduling method with the help of the POM-QM program to increase the acceleration of maintenance time. Scheduling is made by calculating the logic of dependency and time of each maintenance activity. Activity scheduling is carried out on 7 types of maintenance, namely carburetor light service, carburetor and CVT light service, injection light service, injection and CVT light service, oil change, spare part replacement, oil and spare part replacement and final inspection of each type of maintenance. After that, the analysis of the scheduling results is done by comparing the results before and after the proposed improvement. Based on the results of research conducted it can be seen that the maintenance time at the authorized service station can be accelerated by using the CPM scheduling method. The efficiency of acceleration of maintenance time is 16.666% to 57.889%. The preparation of maintenance activities and processing of heavy service data is required if there is heavy service maintenance in the authorized service station.
ISSN:1757-8981
1757-899X
DOI:10.1088/1757-899X/885/1/012059