A Study on Analysis of Long Span Continuous Rigid Frame Bridge

A case study of a large span pre-stressed concrete continuous rigid frame bridge (Ba-Mao-Chong bridge) of GUI DU high speed railway. Finite element program Midas/Civil is used to simulate the construction process and operation phase, the influence of concrete overweight, pre-stressing loss, concrete...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:IOP conference series. Materials Science and Engineering 2019-10, Vol.611 (1), p.12045
Hauptverfasser: Xu, Guihong, Yang, Bin, Chen, Chuang, Wei, Shirong, Li, Zhenxue
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!