A Study on Analysis of Long Span Continuous Rigid Frame Bridge

A case study of a large span pre-stressed concrete continuous rigid frame bridge (Ba-Mao-Chong bridge) of GUI DU high speed railway. Finite element program Midas/Civil is used to simulate the construction process and operation phase, the influence of concrete overweight, pre-stressing loss, concrete...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:IOP conference series. Materials Science and Engineering 2019-10, Vol.611 (1), p.12045
Hauptverfasser: Xu, Guihong, Yang, Bin, Chen, Chuang, Wei, Shirong, Li, Zhenxue
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:A case study of a large span pre-stressed concrete continuous rigid frame bridge (Ba-Mao-Chong bridge) of GUI DU high speed railway. Finite element program Midas/Civil is used to simulate the construction process and operation phase, the influence of concrete overweight, pre-stressing loss, concrete shrinkage and creep, stiffness loss and other factors that related the long-term deflection of bridge are analyzed. The calculation results show that: (1) The overweight concrete and Bridge deck pavement construction error could cause the bridge long-term deflection increases. (2) The creep coefficient, environment humidity, and other factors on the bridge have significantly influence on long-term mid-span deflection, (3) The beam stiffness reduction could lead to the bridge long-term mid-span deflection increase.
ISSN:1757-8981
1757-899X
DOI:10.1088/1757-899X/611/1/012045