Designation of Short-term Power Forecasting System for PV Power System and Its Cluster Integrated with Distribution Power Network
This paper analysis under the conditions of power penetration of PV power system integrated with distribution power network is 0%, 5%, 10%, 15%, 20%, 24.46%, 30%, 35%, 40%, 50%, 60% and 75% respectively, the effects for common bus-bar load forecasting accuracy. Then, designation for the configuratio...
Gespeichert in:
Veröffentlicht in: | IOP conference series. Materials Science and Engineering 2019-04, Vol.490 (7), p.72025 |
---|---|
Hauptverfasser: | , , , , , , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | This paper analysis under the conditions of power penetration of PV power system integrated with distribution power network is 0%, 5%, 10%, 15%, 20%, 24.46%, 30%, 35%, 40%, 50%, 60% and 75% respectively, the effects for common bus-bar load forecasting accuracy. Then, designation for the configuration, NWP solving, real-time data collection and PV power system and its cluster power forecasting of short-term PV power forecasting system. In addition, validation for the accuracy of PV power system cluster short-term power forecasting results, and the results indicate that the proposed system is able to explore and technical adaption for the business demand for operator of power grid dispatch department and PV power system. |
---|---|
ISSN: | 1757-8981 1757-899X 1757-899X |
DOI: | 10.1088/1757-899X/490/7/072025 |