Stochastic Decomposition of Geo/Geo/1 Production Inventory System

This paper considers an ( s, S ) inventory system with production in which demand occurs according to a Bernoulli process and service time follows a geometric distribution. The maximum inventory that can be accommodated in the system is S . When the items in the on-hand inventory are reduced to a pr...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Journal of physics. Conference series 2021-05, Vol.1850 (1), p.12027
Hauptverfasser: Anilkumar, M.P., Jose, K. P.
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:This paper considers an ( s, S ) inventory system with production in which demand occurs according to a Bernoulli process and service time follows a geometric distribution. The maximum inventory that can be accommodated in the system is S . When the items in the on-hand inventory are reduced to a pre-assigned level of s due to service, production is started. The production time follows a geometric distribution. The production process is stopped as soon as the inventory level reaches the maximum. Customer who arrives during the inventory level is zero is assumed to be lost. Using the stochastic decomposed solution obtained for the steady-state probability vector, we analyzed the inventory cycle. A suitable cost function is defined using the performance measures. Numerical experiments are also incorporated to highlight the minimum value of the cost function against the parameter values.
ISSN:1742-6588
1742-6596
DOI:10.1088/1742-6596/1850/1/012027