Chivor’s Life Extension Project (CLEP): From Sediment Management to Development of a New Intake System

Sedimentation is an important issue that has been studied for the watershed of reservoirs, since it increases operational costs of hydropower installations, reduces the life expectancy, and compromises the generation capacity due to volume reduction. This work addresses the implementation of Chivor’...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Water (Basel) 2020-10, Vol.12 (10), p.2743
Hauptverfasser: del Río, David A., Moffett, Hugo, Nieto-Londoño, César, Vásquez, Rafael E., Escudero-Atehortúa, Ana
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:Sedimentation is an important issue that has been studied for the watershed of reservoirs, since it increases operational costs of hydropower installations, reduces the life expectancy, and compromises the generation capacity due to volume reduction. This work addresses the implementation of Chivor’s Life Extension Project (CLEP), developed in order to extend the life of La Esmeralda reservoir, which is used for power generation in Colombia. Sediment dynamics studies are first described and connected to the need of the AES Corporation to extend the life expectancy of the Chivor Hydropower Project. The geotechnical and hydraulic designs are described and the main considerations and tools for the execution of such a project are addressed. The construction of the new intake system was developed under favorable geomorphological, geological, and hydrogeological conditions, and the project is being developed without affecting the current operation. Such an innovative project is the first of its class in Colombia and goes from studies of sediment transport and sediment management strategies in the watershed to the design and construction of new intakes, in order to extend the life of an existing 1000-MW (6% of Colombia’s demand) powerplant for 50 more years, contributing to a sustainable energy supply for the future.
ISSN:2073-4441
2073-4441
DOI:10.3390/w12102743