Thrust Validation of Rotating Detonation Engine System by Moving Rocket Sled Test
This Paper presents the results of a rotating detonation engine rocket sled test demonstration on a 127 mm gauge rail at 100 m long high-speed running track test equipment to evaluate the thrust performance of a stand-alone rotating detonation engine propulsion system. The developed sled test demons...
Gespeichert in:
Veröffentlicht in: | Journal of propulsion and power 2021-05, Vol.37 (3), p.419-425 |
---|---|
Hauptverfasser: | , , , , , , , , , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | This Paper presents the results of a rotating detonation engine rocket sled test demonstration on a 127 mm gauge rail at 100 m long high-speed running track test equipment to evaluate the thrust performance of a stand-alone rotating detonation engine propulsion system. The developed sled test demonstrator contained all onboard subsystems, including engine, gas cylinders, valves, controller, and a data logger. The sled test demonstrator successfully generated thrust, and three or four detonation waves of 1460 to 1800 m/s were observed during the 2.0 s burn time. The measured specific impulse in the sled test was 144 s as estimated from the acceleration of the demonstrator and the mass decrease in the onboard cylinders. The test results were compared with the data from a laboratory-stand firing test using a load cell, and the specific impulses of the sled test were found to be comparable to the results of the stand firing test. |
---|---|
ISSN: | 1533-3876 0748-4658 1533-3876 |
DOI: | 10.2514/1.B38037 |