Transient simulation model and process simulation analysis of fast cut back process in thermal power plant

Fast Cut Back (FCB) technology of large thermal power plant can maintain the isolated operation of auxiliary power after the units are disconnected from the power grid. FCB unit can immediately cut off all external loads without turbine or boiler shutdown in case of large power grid failure, and sup...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Journal of physics. Conference series 2021-02, Vol.1754 (1), p.12144
Hauptverfasser: Ruling, Huang, Lin, Li, Qing, Cao, Yan, Gao, Tao, Luan
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:Fast Cut Back (FCB) technology of large thermal power plant can maintain the isolated operation of auxiliary power after the units are disconnected from the power grid. FCB unit can immediately cut off all external loads without turbine or boiler shutdown in case of large power grid failure, and supply power immediately as the external power grid fault eliminated, which has a very important impact on improving the stability and the recovery speed of the power grid system. Therefore, it is necessary to establish a dynamic mathematical model of thermal power plant to simulate FCB process. According to the principle of mass and energy balance, a dynamic mathematical model of 1050 MW thermal power unit was established. The model considered the change trends of main steam pressure and temperature caused by the action of main steam valve and high-pressure (HP) bypass valve in FCB process, and the action characteristics of safety valve and pressure control valve (PCV) valve in FCB system. This model provides a reference for the simulation and control of FCB process in thermal power unit.
ISSN:1742-6588
1742-6596
DOI:10.1088/1742-6596/1754/1/012144