Management of Short-Run Production

The load distribution in manufacturing equipment during short runs of diverse products is considered. A method is proposed for optimal distribution of the technological operations so as to reduce the manufacturing time for a new product by decreasing equipment downtime.

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Russian engineering research 2020, Vol.40 (12), p.1107-1108
Hauptverfasser: Khoroshko, L. L., Kuznetsov, P. M.
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The load distribution in manufacturing equipment during short runs of diverse products is considered. A method is proposed for optimal distribution of the technological operations so as to reduce the manufacturing time for a new product by decreasing equipment downtime.
ISSN:1068-798X
1934-8088
DOI:10.3103/S1068798X20120333