On designing Maxwell CUSUM control chart: an efficient way to monitor failure rates in boring processes
The ordinary CUSUM chart is based on normality assumption. But in real-life phenomenon such as monitoring of lifetime variable, this assumption is not always valid. Hence, a variant of the CUSUM chart, the VCUSUM chart, has been constructed to monitor small shift in a process that is based on a Maxw...
Gespeichert in:
Veröffentlicht in: | International journal of advanced manufacturing technology 2019-02, Vol.100 (5-8), p.1923-1930 |
---|---|
Hauptverfasser: | , , , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The ordinary CUSUM chart is based on normality assumption. But in real-life phenomenon such as monitoring of lifetime variable, this assumption is not always valid. Hence, a variant of the CUSUM chart, the VCUSUM chart, has been constructed to monitor small shift in a process that is based on a Maxwell distribution. The performance of the chart has been checked by studying the run length properties and it was found to perform better for small shifts as compared to Shewhart type V chart for Maxwell parameter. Finally, a real-life application is presented to monitor the failure rate of a vertical boring machine. |
---|---|
ISSN: | 0268-3768 1433-3015 |
DOI: | 10.1007/s00170-018-2679-1 |