Long on promises, short on delivery? Insights from the first two years of onshore wind auctions in Germany

Renewable energy auctions have been lauded for bringing about price reductions. However, the methods applied in investigating such impacts have so far been inadequate and often do not allow conclusions to be drawn as to whether observed price reductions were caused by auctions or by other factors. W...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Energy policy 2020-05, Vol.140, p.111240, Article 111240
Hauptverfasser: Grashof, Katherina, Berkhout, Volker, Cernusko, Robert, Pfennig, Maximilian
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:Renewable energy auctions have been lauded for bringing about price reductions. However, the methods applied in investigating such impacts have so far been inadequate and often do not allow conclusions to be drawn as to whether observed price reductions were caused by auctions or by other factors. We have analysed the outcomes of the first onshore wind auctions in Germany held in 2017 and 2018, taking into account the site-specific wind conditions and realisation deadlines of the successfully bid projects. Our results show that after a temporary reduction, prices exceeded both the initial levels and the transitional feed-in tariff. A lack of public acceptance and numerous legal complaints against building permissions have contributed to bids falling below auction volumes in 2018. These results are discussed against the backdrop of the functional and structural promises associated with the introduction of auctions, including reduced remuneration levels, better control of the pace of the capacity expansion and who is able to influence the setting of the remuneration levels. •Cost impacts of renewable energy auctions lack systematic empirical investigation.•Study analyses first two years of onshore wind auctions in Germany.•Project-specific wind conditions and implementation deadlines taken into account.•After a temporary reduction, prices exceeded both initial levels and the parallel FIT.•Results are discussed in the context of expectations prior to the policy change.
ISSN:0301-4215
1873-6777
DOI:10.1016/j.enpol.2020.111240